Vapor Recovery Unit RFQ Data Sheet for real project discussions
Vapor Recovery Unit RFQ Data Sheet is not a one line equipment choice. For buyers preparing a VRU request for quotation, the right vapor recovery route depends on the vapor source, peak flow, composition, operating rhythm and site safety limits. This page explains what PollutionCtrl normally checks before recommending a vapor recovery unit, a condensation and adsorption route, an adsorption and absorption system, or another VOC control option.

VRU project reference for equipment buyers
Where this inquiry usually starts
Buyers often start with the keyword “vapor recovery unit RFQ”, but the first useful question is simpler: where does the vapor come from, and how does it change during operation? In buyers preparing a VRU request for quotation, the vapor load can rise quickly during filling, loading, heating, pressure change or product transfer. A design based only on average flow may miss the peak condition.
Engineering points to check
The main review points are what data makes a quotation useful instead of vague. These details affect equipment size, control logic, safety devices, recovered liquid handling and operating cost. If the vapor includes water, heavy hydrocarbons, benzene, methanol, mixed solvents or unstable composition, the process route should be checked more carefully before a price is confirmed.
Possible process route
A VRU may use condensation, adsorption, absorption, compression, gas liquid separation or a combined process. For some sites, recovery is the main goal. For others, safe VOC control and stable discharge are more important. When recovery is not practical, the project may need to compare a VRU with thermal oxidation, catalytic oxidation, activated carbon polishing or another VOC treatment system.
What we avoid guessing
We do not invent recovery rate, outlet concentration, hazardous area classification or compliance results from a page title. Those numbers should come from project data, local requirements and final process design. If you do not have a full gas analysis yet, send the available information and we can help build a data checklist.
Request a quote
To discuss vapor recovery unit RFQ, send vapor source, product name, flow range, composition if known, temperature, pressure, working hours, loading or breathing pattern, installation area, utilities and required delivery scope. Photos, P&ID sketches or a short process description are also useful.
Information to include in a VRU RFQ
A quotation becomes more useful when the operating range is clear. A product name alone is not enough to select a compressor, condenser, adsorption bed, controls or safety devices.
| RFQ section | Useful information |
|---|---|
| Vapor source | Tank farm, truck loading rack, marine terminal, refinery process vent or solvent operation |
| Process data | Product, composition, normal and peak flow, temperature, pressure, oxygen, moisture and liquid carryover |
| Operating pattern | Breathing, filling, batch loading, continuous operation, simultaneous loading and working hours |
| Site conditions | Country, hazardous-area classification, available power, cooling, instrument air, footprint and pipe connection points |
| Delivery scope | Skid, piping, control panel, documents, inspection, shipment, installation, commissioning and spare parts |
Photos, a P&ID sketch, tank data sheet or a short operating video can help when the formal process data is not complete. Use the VRU cost factors page to understand which missing items may affect the budget.
FAQ
What should be included in an RFQ?
A useful RFQ should include vapor source, flow range, composition, operating schedule, installation area, utilities, hazardous area requirements, delivery scope and documentation needs.
Can this page be used for an early budget inquiry?
Yes. Early inquiries are common. A budget range can be discussed from basic process information, but final equipment scope should wait until vapor composition, peak flow and site interfaces are checked.
Do you provide a fixed compliance promise?
No. Emission and safety requirements depend on local rules, test method, site conditions and final process design. We can help review the technical route and the data needed for a project specification.


