Project Overview

Odor control for the regulation tank and emergency sludge holding tank of an industrial park enterprise WWTP. Design air volume: 5,600 m3/h.

Odor Components

Hydrogen sulfide, volatile sulfides and small-molecule organic acids

Operating Challenges

Very limited reserved space; retrofit project; exhaust is humid and emitted intermittently.

Treatment Process

Sealed tank cover collection → water scrubber tower → fine filter → low-temperature plasma deodorization system → elevated discharge

Main Equipment

Corrosion-resistant fan, scrubber tower, fine filter, DBD low-temperature plasma unit

Treatment Results

No obvious rotten-egg odor around the tanks; stably meets environmental inspection requirements.

Operating Cost

0.52–0.61 CNY / 1,000 m3 of exhaust gas

Technical Highlights

Compact layout fits tight retrofit space; fine filter protects the plasma chamber under humid intermittent duty.

This project uses a Low-Temperature Plasma combined process. Learn more about the technology on our Low-Temperature Plasma equipment page. For a similar design, contact us at info@pollutionctrl.com / WhatsApp +86 19833770783.

Engineering Approach

Odor-control retrofits begin with capture: hoods and duct routing are arranged so the fan sees the lowest practical excess air, then the treatment stage – low-temperature plasma or microwave-UV – is sized against the measured or estimated pollutant spectrum and the intermittent profile of generation.

System Composition

A standard package comprises pretreatment (demisting/filtration where humidity or droplets are present), the oxidation stage with multiple modular trains, induced-draft fan, stack, and a control cabinet with interlocked start-up so the treatment unit always runs before the extraction fan ramps.

After-Sales

Modularity keeps maintenance predictable: individual trains isolate electrically for service without stopping the line. Consumables are limited to filters and periodic lamp/electrode inspection – both items stocked for quick dispatch.

Why a retrofit at a treatment plant is a space problem first

Regulation and emergency sludge holding tanks at an industrial park treatment plant are usually built before the odour requirement existed. The reserved space is what it is, and the system has to fit into it. That constraint drives the configuration more than the chemistry does: a compact skid with a small footprint is selected because a biofilter or a large thermal unit cannot be accommodated.

Why the sequence is scrubber, filter, then plasma

  • Scrubber — reduces hydrogen sulphide and conditions the humid gas.
  • Fine filter — protects the plasma electrodes from carry-over, which is the most common cause of declining performance in retrofit installations.
  • DBD plasma — oxidises the residual volatile sulphides and organic acids.

Why the exhaust is discharged at elevation

Where the treated gas still carries a residual odour note, an elevated discharge uses the atmosphere as a final buffer. That is a legitimate part of the design, but it depends on there being no sensitive receptor close enough for the plume to reach at ground level — which is why the receptor distance has to be part of the design basis.

What to specify for a similar retrofit

  1. Available footprint and the access route for installation.
  2. Tank volume, filling pattern and the resulting emission peaks.
  3. H2S and organic sulphur concentration, including the emergency holding tank which can be the worst case.
  4. Gas humidity and temperature at the extraction point.
  5. Nearest receptor distance and the boundary odour target.
  6. Whether the plant operates unattended, which drives remote monitoring requirements.

Frequently asked questions

Why is the emergency holding tank often the design case?

Because it can hold sludge for longer and at higher strength than the normal flow, so its headspace concentration is higher. Designing only on the normal regulation tank under-sizes the system for the worst day.

Can the system be expanded later?

That should be decided at the layout stage. Leaving space and a spare electrical capacity for a second stage is much cheaper than retrofitting one into an occupied plant room.