Industrial vapor recovery and air pollution control equipment background

Contact Us | Get a Quote for Air Pollution Equipment

Email: info@pollutionctrl.com
Phone: +86 18301170098
WhatsApp: 19833770783
WeChat: 18301170098
Address: 4th Floor, Building 1, No. 85 Hong’an Road, Fangshan District, Beijing, China

Send Us Your Project Inquiry

Download Product Brochure (PDF)

Your information is only used to respond to your inquiry.

What to Include in Your Inquiry

To speed up engineering review, include: process gas or water stream description, flow rate (Nm3/h or m3/h), temperature, pollutant types and expected concentration, emission target or discharge standard, site power supply and any space constraints.

Response Time

Inquiries are answered within one business day. For urgent projects, note your deadline in the message and we will prioritize the evaluation.

What to include in a VOC treatment inquiry

An air pollution control quotation is only as good as the process data behind it. Two buyers describing “the same” 20,000 m³/h exhaust can need very different equipment, because the deciding variables are not the airflow alone.

ParameterWhy it changes the answer
Exhaust flow rate (Nm³/h or m³/h)Sets the equipment size and the ductwork; must be stated at normal conditions with the worst case identified
Pollutant species and inlet concentrationDetermines whether a thermal, catalytic or biological route is viable, and whether the unit can run autothermally
Gas temperature and moistureDrives preheating, condensation risk and the choice of heat exchanger and materials
Particulate loadingParticulate blinds catalyst and fouls heat exchange media, so filtration may have to come first
Required destruction or removal efficiencyThe permit limit, not a generic 99%, defines the design target
Presence of halogens, sulphur or siliconeRules in or out catalytic routes, and sets the material and the quench requirement
Operating hours and duty cycleA unit that stops and starts frequently needs a different thermal design from one that runs continuously
Available plot, utilities and powerOften decides between one large unit and two smaller ones
Destination market and applicable codeSets the certification, the electrical standard and the documentation package

How an inquiry is handled

  1. Process review — the stream data is checked against the candidate technologies, and any route that cannot work is ruled out early rather than quoted anyway.
  2. Clarification — missing parameters are requested instead of assumed, because a wrong concentration produces a wrong unit and an unachievable guarantee.
  3. Technical proposal — the quotation states the design basis, the equipment configuration, the guarantee point and the utility consumption, so it can be compared with another offer on equal terms.
  4. Documentation — drawings, material certificates and test records are issued with the order.

Frequently asked questions about the inquiry process

Can you quote from an emission limit alone?

Not usefully. The limit sets the target, but the flow rate, the concentration and the pollutant species determine the equipment. Without them any figure would be provisional.

What if we do not have a full gas analysis?

State what is known and what is estimated. A preliminary selection can be made on partial data, but the final guarantee should be based on a measured or design-basis analysis.

Do you work with an existing treatment unit?

Yes. Retrofits, upgrades and replacements are common, and the useful information is the existing unit’s duty, its measured performance and the reason for the change.

Page last updated: . First published: . Publisher: PollutionCtrl.